TheCharterBox Freight Rate Converter

Dimensions (per package)
Total Volume CBM
Volumetric Weight KG
Actual Weight KG
Chargeable Weight KG
Revenue Ton (W/M)
Add Surcharges
Rates are approximate and may vary by carrier. Adjust as needed.
Surcharge Rate Currency Basis Amount
Base Freight
Surcharges Subtotal
Total Freight Cost
Converted Total
Unit Rate Breakdown
Packages That Fit
Packages per Layer
Number of Layers
Volume per Package CBM
Total Loaded Volume (your shipment)
Total Loaded Weight (your shipment)
Volume Utilisation
0%
Weight Utilisation
0%
Remaining Volume CBM
Remaining Payload KG
Key Definitions
Demurrage
Charges for cargo occupying space at the port/terminal beyond the allowed free time. Applies to import containers sitting at the port before collection.
Detention
Charges for holding a shipping line's container outside the port beyond the allowed free time. Applies after the container has been collected but not returned empty.
Combined
Some carriers merge both demurrage and detention into a single tariff.
Free Days
The number of days the shipping line allows before charges begin. Typically 3-7 days for demurrage and 4-7 days for detention.
Demurrage
From Day To Day Daily Rate Currency
Detention
From Day To Day Daily Rate Currency

Demurrage Charges

Days at Port days
Free Days
Chargeable Days
Demurrage Cost

Detention Charges

Days Out of Port days
Free Days
Chargeable Days
Detention Cost
Total Charges
Converted Total
Per Container
Day-by-Day Breakdown
Day Date Type Status Daily Rate Cumulative
Cargo Reference
Subtotal:
# Leg From → To Rate Qty Subtotal In USD
TOTAL

Cost Composition

Seller's Cost/Risk Buyer's Cost/Risk Risk Transfer Point
Seller Buyer Risk Transfer

Scroll to Top